The ACCESS project was undertaken between January 1997
and March 1999 by National Air Traffic Services (NATS) Ltd, the Service
Technique de
la Navigation Aérienne (STNA) and the Deutsche Flugsicherung (DFS) and
was part-funded from the European Commission's programme for financial
aid in the field of Trans-European Networks - Transport (TEN-T ATM Project
1996-GB-94-S "Aeronautical Telecommunications Network Implementation
Feasibility Studies").
This archive contains the Final Study
Report together with the interim Work Package (WP) results that
were used to generate the study material from which the Final Report
was synthesized. Appendix A of the Final Report provides a detailed
index to these WPs.
If you have any comments on these documents or wish to discuss the
ACCESS Report findings in more detail please contact Brian Cardwell,
NATS Ltd.
ACCESS Project - Work Package Index
ACCESS Part 1: Phase 1 - Target ATN Infrastructure
ACCESS Part 1: Phase 2 - Network Implementation Issues
ACCESS Part 1: Phase 3 - ATN Infrastructure Transition
ACCESS Part 2: ATSMHS Interoperability and Validation
|